Cement Filling & Packing line

Stirred by its vision to develop the construction sector in Palestine, besides producing local cement to replace imported quantities, in order to ensure continuous supply of this vital commodity; Sanad was able in August 2018 to start operating the cement filling and packing line based in Jericho, in addition to the establishment and operation of silos for storing bulk cement imported from Jordan.

The line’s production capacity is 500 thousand tons annually, while the storing capacity at the same site reaches 10 thousand tons of packed cement, and 8 thousand tons of bulk cement. It is worth noting that throughout the design and construction of the production line, the company was committed to relevant Palestinian and European standards, in terms of ecological parameters and production processes.